LEARNING ROOM / Installs
Build a removable quick weave
Map and build a cap-based unit off the head.
01 / PREPARATION
Gather your supplies
- Fitted cap
- Wig block
- Processing cap
- Wefts
- Compatible bonding system
Hair Tingz picks for this guide
As an Amazon Associate I earn from qualifying purchases.
Follow your installer’s barrier and removal instructions. Keep weft adhesive off the scalp.

Salon Pro 30 Sec Super Hair Bonding Glue, 4 oz
A weft adhesive for a compatible bonding system.
Shop on Amazon ↗
Salon Pro 30 Sec Super Hair Bond Remover Oil, 8 oz
Use the remover specified for your weft adhesive.
Shop on Amazon ↗
Hemndic Adjustable Wig Stand with Head, 37–50 Inches
Support the unit while you inspect its shape or work on the cap.
Shop on Amazon ↗
GDMINLO 60-Inch Soft Measuring Tape, White
Measure the cap, track or desired length before choosing a size.
Shop on Amazon ↗
Before you start
Choose a fitted cap, block and a bonding system meant for the cap material. Decide on a closed top or a leave-out opening.
02 / STEP BY STEP
The method

Mount the fitted cap on the blockSet the cap at its wearing tension over the protective layer specified for the block setup. Fit the capTry on and mark the bare cap, then mount it at its wearing tension over a protective processing cap on the block.
Dry-fit rows from the nape upwardCheck that each next row covers the binding below and falls in the intended direction. Map the rowsDry-fit the first rows from nape upward. Check that the next row covers the binding and that the hair falls in the desired direction.
Finish the ends before bondingSecure cut binding ends and apply compatible adhesive only as the system directs. Bond the tracksCut and finish track ends. Apply adhesive according to its directions and check for seepage. Reserve space for reinforcement if the unit will have an opening.
Finish the top for the chosen designUse the compatible closure, or reinforce the retained U-part edge before cutting. Finish the topFinish with a compatible closure or covered top row. For a U-part, reinforce the edge before cutting. Let the bond fully set before removing the unit from the block and fitting it.
Check coverage before adding fastenersInspect front, crown and nape after the bond has fully set, then mark the attachment points. Check coverageCheck coverage at the front, crown and nape before adding the final fasteners.
03 / TRY A SMALL SECTION
Practice & check your work
Map and photograph three rows on the block before applying glue.
Get hands-on help for concealed stitches, structural lace or bonded attachments.
04 / AFTER THE TECHNIQUE
Care & removal
Care while wearing
Let the cap dry completely after cleaning and inspect the bonds before wearing it again.
Take it down gently
Release the wig fasteners and lift the unit off. Use the specified remover for track salvage.
05 / LEARN WITH THE CREATORS
